This is where we are so far in our kitchen remodel. The counter top people messed up on laying the counters on the peninsular. It is not centered and there are a lot of flaws in the finished product. They are coming back on Monday to look at it. The Lowe's people came and looked at it on Friday. I can't tell you how sick of this I am. We have had a lot of miss communication with all involved.
We had the floor people come and match the flooring where the old cabinets were, had a painter come and paint, a plumber to connect the dishwasher, the sink and the faucet and an electrician to update some wiring.
Our last project at our former home, we re-modeled over half of our home. We had very few problems on that job. I can't say the same this time. Hopefully, this project will be finished by November for Thanksgiving. Still have a punch list of items to do. All in all, I love my cabinets and have so much more storage space. That part I am happy with.
They need to do the toe kick and the back side of my peninsular, replace a cabinet and the counters and install the microwave and the vent hood. I haven't filled all the cabinets up yet. Of course, I need to polish my stainless steel and decorate. Hubs and I are working on a flower bed by the drive way. I am so happy that Autumn is finally here. Thankful for some cooler temperatures.
5 comments:
It will be beautiful when you get everything finished and up and running.
It's beautiful honey. I know how hard it is to have people in and out of your house all day, but when things aren't done right it's even more awful. You'll get it fixed.
Have a terrific day. Big hugs. :)
The parts that are done look terrific.
Well despite the problems it's looking great! I know how stressful having a new kitchen fitted can be, I don't envy you that. x
When you finally get it all complete to your satisfaction what a dream come true! Lovely!
hugs
Sandi
Post a Comment